Irrigated orchard rows in Tehama County

Groundwater Sustainability Agency

Groundwater Sustainability Plans

In response to a state law enacted in 2014 – the Sustainable Groundwater Management Act (SGMA) – a roadmap for how groundwater will be managed over the next two decades will be finalized this year. The goal is to balance the amount of groundwater pumped with the amount that is replenished each year by nature or humans. Groundwater Sustainability Plans (GSPs) must be adopted and submitted to the State by January 31, 2022.

Latest Submission

Revised GSPs submitted to DWR in April 2024

Revised plans for the Los Molinos, Red Bluff, Antelope, and Corning Subbasins, plus annual reports for every subbasin through water year 2025.

New to SGMA?

Start here

Helpful resources for those new to the Sustainable Groundwater Management Act (SGMA) and its implementation in Tehama County.

Video · 4 min · DWR

Understanding Groundwater

Video · 5 min · Self-Help Enterprises

SGMA and working together

Brochure · CFBF

SGMA 101

Videos · Self-Help Enterprises

Videos en español

Factsheet · Tehama County

Implementing SGMA in Tehama County

Access the GSP Documents · April 2024

Revised GSPs

In response to DWR’s incomplete designation, the GSPs were revised and submitted to DWR in April 2024. Choose a subbasin to see its documents.

Los Molinos Subbasin14 documents
Los Molinos Subbasin Revised GSP documents
DocumentFiles
GSP Cover
Acknowledgements
Signature Page
Preface
Table of Contents
Executive Summary
Chapter 1 – Introduction
Chapter 2A – Plan Area
Chapter 2B – Basin Setting
Chapter 2C – Water Budget
Chapter 3 – Sustainable Management Criteria
Chapter 4 – Projects and Management Actions
Chapter 5 – Plan Implementation
Chapter 6 – References
Red Bluff Subbasin14 documents
Red Bluff Subbasin Revised GSP documents
DocumentFiles
Cover
Acknowledgements
Signature Page
Preface
Table of Contents
Executive Summary
Chapter 1 – Introduction
Chapter 2A – Plan Area
Chapter 2B – Basin Setting
Chapter 2C – Water Budget
Chapter 3 – Sustainable Management Criteria
Chapter 4 – Projects and Management Actions
Chapter 5 – Plan Implementation
Chapter 6 – References
Antelope Subbasin14 documents
Antelope Subbasin Revised GSP documents
DocumentFiles
Cover
Acknowledgement
Preface
Signature Page
Table of Contents
Executive Summary
Chapter 1 – Introduction
Chapter 2A – Plan Area
Chapter 2B – Basin Setting
Chapter 2C – Water Budget
Chapter 3 – Sustainable Management Criteria
Chapter 4 – Projects and Management Actions
Chapter 5 – Implementation
Chapter 6 – References
Corning Subbasin17 documents
Corning Subbasin Revised GSP documents
DocumentFiles
Cover and Table of Contents
Executive Summary
Chapter 1 Introduction
Chapter 2 Description of Plan Area
Chapter 3 Basin Setting
Chapter 4 Water Budgets
Chapter 5 Monitoring Networks
Chapter 6 Sustainable Management Criteria
Chapter 7 Projects and Management Actions
Chapter 8 Plan Implementation
References
Appendix 1- E DWR Determination Letter
Appendix 2- I Crop Land Cover Corning Subbasin
Appendix 3 -B Hydrographs, Measurable Objectives and Minimum Thresholds of Groundwater Level Sustainability Indicator Wells
Appendix 3-E Well Impact Analysis
Appendix 7-G Demand Management Resolution
Appendix 7-H Well Mitigation Resolution

Adopted December 20, 2021

Final GSPs

The GSPs were adopted by the Tehama County Flood Control and Water Conservation District Board of Directors on December 20, 2021. Choose a subbasin to see its chapters; appendices sit beside each chapter.

Bowman Subbasin16 documents
Bowman Subbasin Final GSP documents
DocumentFiles
GSP Cover and Executive Summary
Chapter 1 – Introduction
Chapter 2A – Plan Area
Chapter 2B – Basin Setting
Chapter 2C – Water Budget
Chapter 3 – Sustainable Management Criteria
Chapter 4 – Projects and Management Actions
Chapter 5 – Implementation
Chapter 6 – References
Los Molinos Subbasin15 documents
Los Molinos Subbasin Final GSP documents
DocumentFiles
GSP Cover
Chapter 1 – Introduction
Chapter 2A – Plan Area
Chapter 2B – Basin Setting
Chapter 2C – Water Budget
Chapter 3 – Sustainable Management Criteria
Chapter 4 – Projects and Management Actions
Chapter 5 – Implementation
Chapter 6 – References
Red Bluff Subbasin16 documents
Red Bluff Subbasin Final GSP documents
DocumentFiles
GSP Cover and Executive Summary
Chapter 1 – Introduction
Chapter 2A – Plan Area
Chapter 2B – Basin Setting
Chapter 2C – Water Budget
Chapter 3 – Sustainable Management Criteria
Chapter 4 – Projects and Management Actions
Chapter 5 – Implementation
Chapter 6 – References
Antelope Subbasin16 documents
Antelope Subbasin Final GSP documents
DocumentFiles
GSP Cover and Executive Summary
Chapter 1 – Introduction
Chapter 2A – Plan Area
Chapter 2B – Basin Setting
Chapter 2C – Water Budget
Chapter 3 – Sustainable Management Criteria
Chapter 4 – Projects and Management Actions
Chapter 5 – Implementation
Chapter 6 – References
Corning Subbasin19 documents

The Corning Subbasin GSP was adopted by the Tehama County Flood Control and Water Conservation District on December 20, 2021. More information and documents: corningsubbasingsp.org.

Corning Subbasin Final GSP documents
DocumentFiles
Cover and Table of Contents
Executive Summary
Section 1 Introduction
Section 2 Description of Plan Area
Section 3 Basin Setting
Section 4 Water Budgets
Section 5 Monitoring Network
Section 6 Sustainable Management Criteria
Section 7 Projects and Management Actions
Section 8 Plan Implementation
References

Annual Reports

Annual reports by subbasin

Annual reports for water years 2021–2025. Reports were prepared by Luhdorff & Scalmanini, Consulting Engineers; the 2021 Annual Report for the Corning Subbasin was prepared by Montgomery & Associates.

Loading annual reports…

GSP Development

How the plans were developed

The Tehama County Flood Control and Water Conservation District received funding through a Department of Water Resources Proposition 1 grant to develop Groundwater Sustainability Plans (GSPs) for the Bowman, Red Bluff, Antelope, and Los Molinos Subbasins. The District received additional grant funding under Proposition 68 to be used for the Antelope, Red Bluff, and Los Molinos Subbasins.

The District selected a consultant team lead by Luhdorff & Scalmanini Consulting Engineers to develop the four Groundwater Sustainability Plans for submittal to Department of Water Resources by January 31, 2022.

Explore the other Groundwater webpages to learn about developing the GSPs and implementing SGMA in Tehama County, or check out the Groundwater Resources Library to find SGMA resources and materials from previous public meetings.

Stay Involved

Interested parties list

To sign up for the interested parties list, contact Nichole Bethurem at [email protected] or 530-385-1462 ext. 3045.

More on groundwater work: SGMP Round 2 Grant · Groundwater Funding